Project Holyhead Road – Shrewsbury

Since the beginning of the year, we have carried out numerous installation projects throughout the UK. These have varied in size and scope which has provided us with several new clients to work with. Our most recent project completed was at Holyhead Road in Shrewsbury. The project involved supplying and installing our BR-1200 Handrail in […]

Case Study Airedale Hospital

We recently completed a project at Airedale Hospital in West Yorkshire. The project involved supplying and installing our BR-400V Handrail, CG-20 Corner Guards and BL-30 Head Protectors. All products were supplied in one of our newer colours Vaporize which worked perfectly with the white walled contrast. The BR-400V Combi Rail was installed in all circulation […]

Case Study – Warrington Hospital

We recently completed a project at Warrington Hospital in the north of England. This project required a range of our Wall Protection products throughout the new ward, ensuring the vulnerable walls and corners were protected from the daily traffic in the hospital. Within the corridor areas our BR-400V Combi Rail was chosen which combines a […]

Case Study – Tower 42, London

  We recently completed another project in central London which involved supplying and installing our E-1 Heavy Duty Rubber Wall Guard along with our CG-2 Rubber Corner Guards. The materials were to be installed to eliminate the impact damage which was occurring in the basement area of the building. Heavy Duty trollies and machinery were […]

Case Study – Royal Albert and Edward Infirmary

Pawling Systems have just completed the installation of our impact protection products at The Royal Albert and Edward Infirmary in Wigan The project required heavy duty protection to the doors, walls, and corners as well as a handrail support within the corridors. For the main corridor walls the client specified our BR-400V combined handrail and […]

Case Study – Gerrard House, London

We recently completed a project in central London at Gerrard House which involved supplying and installing our WG-12 Wall Guard along with our D-4 Rubber Wall Guard. Prior to commencing the works our dedicated installation supervisor carried out a full site survey to ensure the product chosen was suitable and to record any complications which […]

Case Study – Calthorpe Academy

We recently supplied and installed a range of our wall protection products at Calthorpe Academy in Birmingham City Centre. Prior to commencing the works our dedicated contracts team carried out a full site survey to best determine which products would suit and provide the required level of protection. Our WC-60 Wall Protection Sheets were chosen […]